Training Verification
Access restricted
Your account has not been invited to use this system. Contact your administrator to request access.
Daily Orders
My Orders
All company orders
Field Issues / RFI
Open issues
Answered / closed
Personnel Write-Up
Formal documentation β foreman and above.
Write-ups on record
β±οΈ Crew Hours & Manpower
My timesheets
β Awaiting approval (Superintendent / PM)
ποΈ HR β Weekly payroll master list
Compiles every APPROVED timesheet in the selected week (MonβSun) into one master list per person: days worked, total hours, regular vs overtime (over 40), lates, early departures, and projects. Also builds a per-project man-hour summary.
Operations Dashboard
Reports & Records
ποΈ OSHA Recordkeeping & Safety Metrics
Where these numbers come from: recordable cases are pulled from Incident Reports; hours from EODR crew hours. TRIR = cases Γ 200,000 Γ· hours.
π Site-Specific Safety Package π Open PlanMark
Generates a complete Site-Specific Safety, Health, Lift & Quality Plan for one job. Pick the managers assigned to THIS job, fill in the jobsite info, then generate. The document opens fillable β click any blank and type β then Print β Save as PDF.
β Available Add-Ons
Your plan always includes the core field four β Pre-Task Plans, End-of-Day Reports, Equipment Inspections, and Incident Reports. Everything below is optional.
Generate a complete, professional Site-Specific Safety, Health, Lift & Quality Plan for any job in minutes β emergency action plan, 811 utility-locate compliance, electrical/MV & LOTO safety, excavation controls, nine ready-made AHAs, crane & lift checklists, a full Quality Control plan, SDS register, and daily sign-off forms β automatically filled in with your company, project, and job managers, and fully fillable before printing.
Also includes π PlanMark: PDF & CAD plan markup, measurement takeoff, GPS layout with grade elevations, and field photo pinning β offline-capable on desktop, tablet, and phone.
Plus π‘οΈ JSA Forms: the full Daily Job Safety Analysis & Pre-Task Hazard Assessment β hazard identification, electrical LOTO / zero-energy verification, NFPA 70E PPE checklist, equipment inspection sign-off, emergency action plan, task-step mitigation table, and crew briefing signatures β filled from your own personnel list.
And β±οΈ Time & Manpower: daily crew timesheets with a searchable crew picker, foreman-editable hours, late/early-departure flags routed to your Superintendent or PM for approval, and a one-click HR weekly payroll master list with overtime totals and per-project man-hours.
Your selection includes two (2) admin accounts. Additional admin seats are available for an added fee.
Personnel Directory
CRM & Site Analytics
Site analytics (last 30 days)
Leads pipeline
Drag cards between stages Β· click a card to open it. β° red = follow-up due.
Admin β Personnel & Report Recipients
Names added here appear in the dropdown menus on the forms. Emails are used as recipients when a report is emailed.
π¬ Support Inbox (system administrator)
π¬ Companies (system administrator)
Each company is a separate walled-off workspace.
π Certificates & Training
Upload proof of training for each person. Outside parties can verify by scanning that person's QR code.
π’ Company / Establishment Info (for OSHA 300A)
π Admin Recovery Password
π΅οΈ Audit Log (admin only)
Automatic record of sign-ins, submissions, and changes.